Installation New _best_: Aqmos R2d272

⚠️ Never plunge the drain hose directly into a sewer line or pipe. You must maintain a physical air gap between the physical end of the hose and the spill line of the drain. This completely eliminates the threat of bacterial back-contamination crawling up the discharge line into the food-grade ion-exchange resin tank. 5. Running the Overflow Line

Fill the salt container with regeneration salt tablets (maximum capacity is 50 kg). aqmos r2d272 installation new

If your home water pressure exceeds 6 bar, a pressure reducer is required to avoid damage to the unit. ⚠️ Never plunge the drain hose directly into

The R2D272 usually has terminals labeled: The R2D272 usually has terminals labeled: Thread the

Thread the flexible stainless steel hoses from the mounting block to the 1" AG connection ports on the BNT 1650 valve head. Ensure the gaskets are seated perfectly flat inside the compression fittings to eliminate the risk of leaks. Connect the raw water supply to the valve inlet port and line up the treated water line to the valve outlet port. 4. Creating a Hygienic Waste Water Connection

Attach the flexible stainless steel armored hoses to the mounting block using flat seals. Keep them slightly loose initially to retain flexibility while positioning the cabinet.

Remove the red split pin and secure the hose to the main unit, then fix it with the clamp. Step 3: Install the Waste Water Hose